Installation support

Hardware, a written guide and a walk-through for whoever hangs your panels.

Plan my room
A felt spirit level balanced on a small wall bracket with its bubble exactly centered, two screws and a short pencil mark beside it.
Ships with
Hardware, labels and a written install guide
Also
Layout templates for walls and ceilings
Walk-through
A call with you or your installer
Hung by
You or an installer you choose

Fibson does not send install crews. We plan the installation as carefully as the panels and support whoever hangs them: you, your general contractor, a handyman or a local installer. Most wall panels are a straightforward job for someone comfortable with a drill and a level. Ceiling clouds and baffles involve the building’s structure, sprinklers and lights, and they deserve more care.

What ships with your panels

This is step 6 of how we work, ship and install. With the panels come:

  • Mounting hardware chosen for the walls and ceiling described in your plan: fixings for drywall, masonry or wood, and suspension hardware for clouds and baffles.
  • Labels. Every panel numbered to match the drawings, as described under custom fabrication.
  • A written install guide for your project: the order of work, tools, fasteners for each surface, mounting heights, clearances and the checks to make before and after.
  • Layout templates that transfer hole positions and panel outlines to the wall, and a dimensioned ceiling plan that locates each hanging point from fixed reference lines.

Walking your installer through the plan

Before work starts, we go through the plan on a call with you or your installer: the drawings, the reference lines, the hanging points, what is behind the walls and ceiling, and anything on site that looks different from the photos. During the job, questions about your order or the installation go to support@fibson.com.

Before install day

  • Know your walls. Stud spacing, masonry, tile or existing paneling. The guide’s fasteners depend on it.
  • Know your ceiling. Clouds and baffles hang from structure that can carry their weight, never from sprinkler pipes, ducts, conduit or light fixtures, and not from a suspended ceiling grid unless the building owner confirms it can take the load. If anyone is unsure what the structure can carry, ask the building owner or a licensed engineer before hanging anything.
  • Mark the services. Every sprinkler head, light, smoke detector, camera and diffuser should match the ceiling plan. A panel can block a sprinkler’s spray, so confirm positions with your fire sprinkler contractor or local fire official.
  • Check the rules. Landlords often control what hangs from a ceiling, and your local building department can tell you whether a permit is needed.
  • Plan the electrical. For wood slat walls, outlet and switch boxes may need extending to the new surface by an electrician.

Code and accessibility points

  • Interior finish. The IBC treats panels applied for acoustical correction as interior finish (806.2). Keep the reports listed in your proposal with the building records, because an inspector may ask for them.
  • Stability. Interior finish must be fastened so it will not readily come off at room temperatures of 200°F for at least 30 minutes (IBC 803.14). The guide’s fasteners are chosen with that in mind. Do not swap them for adhesive alone or lighter hardware without asking us.
  • Protrusion. On circulation paths, wall panels with a leading edge more than 27 in and not more than 80 in above the floor may protrude no more than 4 in (ADA 307.2). Spacers and battens count toward that depth.
  • Headroom. Clouds and baffles over walking routes keep at least 80 in clear (ADA 307.4). Measure to the lowest point of the panel, not to the hanging point.

The ADA protrusion checker runs both checks on your numbers.

A typical order of work

  1. Snap reference lines and mark the ceiling hanging points from the plan.
  2. Hang ceiling clouds or baffles first, while the floor is clear for ladders or a lift.
  3. Check heights and level, row by row.
  4. Mark wall panel heights from the floor and hang the wall panels, matching each label to the elevation.
  5. Hang art panels last, once the surrounding panels have set the lines.

Example (fictional). In the example dining room, the installer would first locate the hanging points for 16 clouds in four rows over the tables, check them against the sprinkler heads and lights on the ceiling plan, and hang the clouds with at least 80 in clear above the floor. Next come the 14 fabric wall panels, seven on each long wall at seated ear height, where they project about 2.5 in, within the 4 in limit. The 4 printed art panels go up last. Every label matches a number on the drawings. This is not a Fibson project.

What we do not do

We do not provide install crews, structural sign-off or code approvals, and the local building official decides what applies to your building. What we do is make sure the person hanging the panels has everything the plan assumes: the right hardware, the right numbers and someone to ask. If you are still deciding whether to hang panels yourself, send us the room and tell us who will install them; the guide is written for that person.

Send us the room

Room size, a few photos and what happens in the space. We reply with questions or an outline of the plan.