Fibson homePlan my room
Menu

How we work

Six steps from measurements to panels on the wall, planned before anything is made.

Plan my room
A sewing pattern laid flat on an oat surface with three pale pattern pieces, a saffron tape measure, a pincushion and two pins.
You start with
Room size, photos and how the room is used
Before any order
A room estimate, a panel plan, samples and a quote
You decide
The target first, then the plan and the quote
At the end
Labeled panels, hardware and a written install guide

Most acoustic panels are bought by guesswork: a number that looks about right, in a color that matches, hung wherever there is space. We work the other way round. Your room is worked out on paper first, the result is written down with the arithmetic showing, and you decide whether to go ahead with a plan and a quote in your hands. Nothing is made until you approve both.

The six steps at a glance

Step What you do What you get
1. Send the room Send size, photos, use, finishes and constraints Questions about anything we still need, or an outline of the plan
2. Room estimate Read it and agree or change the target Reverberation time now, the surfaces that drive it, a suggested target with its reasoning
3. Panel plan Review layout and finishes Panel count, sizes, placement, finishes, code and accessibility notes, the test reports behind every number
4. Samples and quote Choose finishes, then approve or decline Swatches of the shortlisted finishes and a written, itemized quote
5. Made to order Approve the print proof if you chose printed art Panels built to the approved schedule
6. Ship and install Hang them yourself or with your installer Panels labeled for placement, mounting hardware, a written install guide and help

1. Send the room

Everything starts with a description of the room you already have. We ask for:

  • Size. Length, width and ceiling height, including the high and low points of a sloped or stepped ceiling.
  • Photos. Each wall straight on, the ceiling and the floor. Photos show us finishes, windows, lights and sprinklers faster than a list can.
  • Use. How many people, doing what, and when the room is at its worst. A dining room on a Friday night and a meeting room full of video calls need different things.
  • Finishes. What the floor, walls and ceiling are made of, plus anything soft already in the room. If you are not sure, describe it and we will ask.
  • Constraints. Landlord rules, sprinkler and lighting layout, colors to match, a budget range, a date you are working toward.

The room measurement worksheet lists what to measure, and what you send and what you receive explains how to photograph a room. Send it all through the contact form or by email.

2. Room estimate

We list every surface with its area and an absorption coefficient from published data for that material, add an allowance for furniture, and calculate reverberation time: how many seconds a sound takes to fade by 60 decibels after it stops. You receive:

  • The reverberation time now, with the method and every coefficient we assumed, so the arithmetic can be checked.
  • The surfaces that drive it. Usually a hard ceiling, a long wall of glass or a bare floor carries most of the problem.
  • A suggested target with its reasoning. No code sets a reverberation target for a restaurant or a home, so the target is a planning choice. Where a published reference exists, such as the LEED v4.1 limits for conference rooms, we name it.

Your decision: agree with the target or change it. Everything after this step depends on that number.

If the estimate shows that your problem is sound coming through a wall rather than echo inside the room, we say so here. Panels absorb sound inside a room; they do not stop it passing through walls, and we would rather tell you that than sell you panels. The room acoustic assessment page explains the method in detail.

3. Panel plan

The target tells us how much absorption the room needs. The plan turns that into panels you can see on your own walls and ceiling:

  • Count and sizes for each panel group, from ceiling clouds over tables to fabric-wrapped wall panels at seated ear height or printed art panels where a wall wants a picture.
  • Placement on a ceiling plan and wall elevations, drawn around your lights, sprinklers, vents, doors and outlets.
  • Finishes, shortlisted to suit the room.
  • Code and accessibility notes. The International Building Code treats panels applied for acoustical correction as interior finish (IBC 806.2), and the required fire class depends on the occupancy and where the panel goes. The plan names what we found and leaves the decision to your local building official. It also checks the ADA limits on how far wall panels project into walkways (307.2) and how low clouds hang over them (307.4).
  • The test reports behind every number. Fibson has not yet tested its finished panels. The plan names the core or fabric maker’s published report, its method, edition and mounting type, so you know where each coefficient came from. See materials and safety.

The plan also shows the estimated reverberation time with the panels in place, so you can see what the layout is expected to do before you commit to it. Acoustic design covers this step.

4. Samples and quote

We send swatches of the finishes on the shortlist, because colors on a screen are not colors in a room. With them comes a written, itemized quote for the panels, hardware and anything else in the plan.

Your decision: approve the plan and the quote, ask for changes, or stop. Nothing is made until you approve. If the layout or a finish needs to change, it changes on paper first.

5. Made to order

Panels are built to the approved schedule: sizes, finishes, edge details and prints. Each panel is labeled with its position on the plan. For printed art panels, the artwork must be yours or licensed to you, and you approve a proof before printing. Custom fabrication describes what can be made. Timing depends on the panels and finishes in your plan; ask about it with your quote.

6. Ship and install

Panels arrive labeled for placement, with mounting hardware and a written install guide. We do not send an install crew; we help you or the installer you choose, and we can walk them through the plan. Ceiling clouds and baffles must hang from structure that can carry them and must stay clear of sprinklers, lights and air diffusers, so coordinate with your trades. Fastening matters for fire safety too: the IBC requires interior finish to stay attached at 200°F for at least 30 minutes (803.14). See installation support.

Where you decide

You make four decisions, each before anything is spent on production:

  1. Agree on the target after the room estimate.
  2. Review the panel plan and its finishes.
  3. Approve or decline the quote.
  4. Approve the print proof, if you chose printed art.

What a plan is not

A room plan is a planning document. It is not a measurement, a stamped engineering drawing or a code approval. It estimates how the room will behave from published data and stated assumptions, and it tells you where those assumptions are weakest. To see one worked through from start to finish, read the example room, a fictional 60-seat dining room taken from 2.3 seconds of reverberation to about 1 second.

Send us the room

Room size, a few photos and what happens in the space. We reply with questions or an outline of the plan.

Plan my room